Skip to content

Posts from the ‘Hillside’ Category

Postcards from the Field: April

This morning we thought we’d take you on a quick virtual tour of some of the projects we are currently working on here at Arciform…

Here are a few of the projects underway…

Hanifan_1920_PacchaTile_Mudrm_D_1

This mudroom in Lake Oswego is getting a very cool tile treatment….

Kirby_197x_SiteVisit_April2015_D_ (24)

A gas pass-thru fireplace in SE Portland is being installed in a mid-century whole house remodel…

EugenisAmy_1952_D_ (106)

Some views are being re-framed at a different mid-century addition project….

EugenisAmy_1952_D_ (104)

… with the help of a VERY large crane.

exterior front - porch underway 4

A porch is coming together out in Beaverton…

Lidberg_1952_(N) Bath 1_After_W_NonPro_(9)

… while some very groovy tile is being set for a mid-century bathroom in Hillsdale.

 

MilliganUsher_1926_Basement_BikeStorage_Print_A_ (1)

Bike racks and lockers are going to add some cool kid style to a basement renovation in NW Portland…

Miltenberger_1940_Radiator_Bench_ (15)

….while this elegant custom radiator cabinet is being prepped for install up in the SW Hills.

Coming soon to Arciform… a historic Portland church gets a bell tower restoration, a Corvallis National Register property gets a new kitchen and the roof gets raised on a collection of dormer addition master suites all over Portland.

So… what are YOU working on?

 Explore the Arciform Project Galleries | About Arciform | Schedule a Design Consultation

Client’s Eye View: 2 Baths with Room to Breathe

HirschShimizu_1926_Bathrm1_A_1_P_Pro (26)Designed by Anne De Wolf. Photo by Photo Art Portraits.

We recently completed a matching pair of upstairs bathroom renovations for a NW Portland client who needed a little elbow room in a fairly small footprint. Here’s her “client’s eye view” of how it all came out.

1.       What were your goals with this bathroom renovation?

We needed to update both baths. The shower bath especially needed a larger showering area and both baths needed updated electrical and plumbing, not to mention a new look. We also had a large Turkish-style tile arrangement that we wanted to incorporate into a wall of the new shower.

(Here’s a look at the shower before the renovation. With a glass door that swung into the shower alcove you can see it was quite a tight fit!)

HirschShimizu_1926_Bath1_B_ (118)

2.       What were some of the challenges the project faced and how did you address them?

The biggest challenge was enlarging the shower area without knocking out all the nearby upstairs walls and re-doing the much of the upstairs. This was achieved by much careful measuring and communicating within the design and project implementation team. In addition to Anne, [Project Manager] Adam made sure the plumber, electrician and inspector made it work. Because of the tight space, lovely and suitable sinks and light fixtures were found. Also new cabinetry was specially designed to work effectively with existing built-ins.

HirschShimizu_1926_Bathrm1_A_1_P_Pro (22)Designed by Anne De Wolf. Photo by Photo Art Portraits.

Here’s a look at the fixtures in Bathroom #1.

HirschShimizu_1926_Bathrm2_A_12_P_ProDesigned by Anne De Wolf. Photos by Photo Art Portraits.

And bathroom #2…

3.       What is your favorite part of the completed bathrooms?

It’s a pleasure to get clean again in simple but elegant surroundings. Showering in the open and lighter shower area feels great. The more sublime soaking experience in the tub speaks for itself. Both bathrooms offer privacy and yet feel more spacious than before.

HirschShimizu_1926_Bathrm2_A_1_P_ProDesigned by Anne De Wolf. Photos by Photo Art Portraits.

4.       Tell us about your experience of working with Arciform.

Mostly gush, gush, gush!

Explore the Arciform Photo Galleries | About Arciform | Schedule a Design Consultation