Kitchen Makeover: Finishing Things Up
We’re getting close to the finish line on our Kitchen Makeover project, making rapid progress on installing the fixtures and finishes that make the transformation complete.
The wine fridge (a major client priority) has been installed into the kitchen’s new peninsula, along with the new stove and range hood from Standard TV and Appliance. The gorgeous new Carrara marble counters from Oregon Tile and Marble have been installed by Wall to Wall Stone Corp.
The new grey undermount sink and faucet from George Morlan Plumbing has been installed along a new compact dishwasher that has been integrated into the existing lower cabinets (always a tricky process in an older home).
Below the sink you can see where the charming original doors have been saved and refreshed with a new coat of paint to match the new upper cabinets.
You can also see the beautiful new floors contributed by Emerson Hardwood Floors and installed by CZ Becker, creating an exact match for the existing flooring in the adjacent dining room.
The final touches will include installing the subway tile backsplash, a wall mounted pot rack for their pots and pans and two sets of floating shelves to display their glassware and dishes within easy reach.
We’re so excited to see the project come together and we look forward to sharing the results with all of you!
Explore More with these Previous Kitchen Makeover Posts:
Contract Revisions: The Devil in the Details
Explore the Arciform Photo Galleries | All About Arciform | Schedule a Design Consultation
Thanks again to our Small Kitchen Makeover Contest Partners: